The Essential Guide to
High Touch Customer Success Management
Discover how to scale high-touch customer success with structure, automation, and human-led strategy.
High-touch customer success is often viewed as the “human” side of SaaS—driven by relationships, intuition, and trust. But in today’s subscription economy, enterprise clients expect measurable outcomes as well as personal attention.
This guide explores how to scale high-touch customer success without losing its human core. You’ll learn how to systematize executive engagement, formalize risk management, strengthen Voice-of-Customer programs, and use digital tools to anticipate needs and accelerate results.
Main Takeaways:
- High-touch success requires structure, not just instinct. Enterprise CSMs must rely on defined playbooks, lifecycle mapping, and risk frameworks to ensure consistency and accountability.
- Proactive risk management protects revenue. Structured risk scoring, automated alerts, and executive visibility help teams act before a renewal is at risk.
- Executive alignment drives advocacy and expansion. Systematic check-ins and shared success plans ensure high-value customers stay strategic, not transactional.
- Process enables empathy at scale. With the right workflows, data, and collaboration, senior CSMs can focus on what matters most: solving problems and strengthening partnerships.
Chapter 1
What “High-Touch” Customer Success Really Means
High-touch Customer Success is a strategic, relationship-driven approach built for your most valuable and complex accounts. It’s defined by proactive engagement, personalized guidance, and executive alignment—but grounded in structure and data.
In a high-touch model, CSMs act as trusted advisors who anticipate customer needs, align outcomes with business goals, and orchestrate cross-functional collaboration across Sales, Product, and Support. It’s about helping customers achieve measurable results through intentional, repeatable motions.
At Gainsight, we describe high-touch as empathy powered by instrumentation: consistent rhythms, clear ownership, and insights that direct effort where it matters most. Process doesn’t replace the human connection—it protects it, ensuring every interaction contributes to long-term value and retention.
Common Misconceptions About High-Touch CS
We hear these statements a lot:
“High-touch Customer Success is more art than science.”
“Our high-touch CSMs know their customers well. We don’t need a lot of process.”
“Our high-touch CSMs are really senior people. They don’t need a lot of process.”
Respectfully, we disagree.
Here’s what’s actually going on in your strategic accounts:
- You can’t afford to mess up. Investors expect renewal rates north of 95% in this segment. That means every single renewal needs to come in. If you lose a 6-figure or 7-figure account, it could ruin your quarter. And there isn’t much room for downsell. Every single at-risk account presents a major issue. And by the way: Your high-touch clients. Notice. Every. Detail.
- You’re dealing with lots of political complexity. You’ve got potentially dozens of senior stakeholders who tend not to see eye-to-eye. You’re herding cats. If you haven’t methodically addressed stakeholder engagement, you’re lost in the jungle.
- Your single large client is actually many little clients internally. You’ve probably sold multiple products to them, across multiple business units, with some units engaged in services engagements and others not. This might seem like high-touch CSM at the surface, but your real-life “accounts to CSM” ratio is actually very high.
- You’re working through massive change management. It’s critical that you have a strong perspective on what specific activities need to be done and what specific milestones need to be achieved. Your methodology is your lifeblood.
Fast Fact: High-touch models can’t just rely on senior instincts—they must evolve with data. Adobe’s 2025 CX trends indicate that AI-driven personalization, unified data, and contextual recommendations are transforming even the most human-led strategies. In effect, top-tier CSMs use automation to amplify insight, not replace empathy.
- Losing a CSM could be disastrous. Big clients want the red carpet. They don’t like losing their CSM. They also don’t like having to get a brand new CSM up to speed. And you, as the vendor, could be in a terrible spot if your CSM leaves. You need to retain all the knowledge you can in institutional memory, not just your CSM’s head.
- Your large clients want you to own the outcome for their business. A senior exec’s job is on the hook. But, chances are, everyone at your company has forgotten what the client really wants. The objectives discussed in pre-sales are buried in a salesperson’s notepad. Your CSM is so tied up in standing meetings that it’s easy to lose sight of the bigger picture.
- A corollary: You will be on the hook for every issue—your issues AND the client’s issues. Large clients don’t often distinguish between them. So you need to own the entire outcome.
- Your senior CSMs don’t want to do repetitive stuff. They’re senior. Not worth their time. They want resources and a lot of air cover. They want the red carpet from their managers.
- If you’re not growing, you’re shrinking. In high-touch accounts, the status quo is not sustainable. You need to constantly be planning how to get more strategic and larger in the account, or you will be engineered out.
- You need to herd cats within your company. You need to ensure your Services team is driving for value and not just project completion. You need your Product team to engage your clients in roadmap discussions. You need to get your Support team to prioritize certain cases. Your CSM’s head is spinning trying to manage all these departments, and s/he wants your help in paving the way.
At Gainsight, we believe in creating processes to help our high-touch CSMs. Here’s how we recommend doing it.
Learn How Leading Enterprises Elevate Customer Success
Discover how the world’s most innovative companies build scalable, high-touch strategies that balance empathy and efficiency.
High-Touch vs. Low-Touch: Finding the Right Balance
High-touch customer success is only one part of a broader engagement spectrum that includes low-touch and digitally scaled models. Each approach serves a distinct purpose, helping teams deliver value efficiently across all customer segments.
Table: High-Touch vs. Low-Touch Benefits & What Each Is Best For
| Model | Definition | Best For | CSM Focus |
| High-Touch | One-to-one, relationship-driven engagement that prioritizes strategic alignment and measurable outcomes. | Enterprise and high-value accounts with complex goals. | Executive relationships, success planning, and long-term partnership growth. |
| Low-Touch (Tech-Touch) | One-to-many, digitally automated engagement using in-app prompts, educational content, and proactive alerts. | SMB or mid-market customers with repeatable use cases. | Adoption through automation, self-service learning, and usage insights. |
| Hybrid | A dynamic model where automation scales engagement and humans step in for strategic moments. | Organizations managing diverse customer segments. | Blending digital signals with personal outreach at key milestones. |
Chapter 2
How to Manage Risks Early and Protect Renewals
We’ve discussed in the past how the Managers within our Gainsight Customer Success team work with their CSMs to manage risk in client relationships using Risk Calls to Action (CTAs) and Scorecard Measures.
But front-line Managers can’t be the only ones enduring sleepless nights when a strategic client is at risk. Your Chief Customer Officer (CCO) should be aware and offer advice to the team, too.
Today, leading CS organizations are enhancing this process with predictive escalation models that identify risks before they surface.
As GitLab’s Customer Success Escalation Handbook highlights, signals like declining usage, unresolved tickets, or stakeholder turnover can automatically trigger alerts long before a renewal is jeopardized—giving teams time to act while preserving the high-touch experience.
Here’s how risks for our largest clients are escalated to the CCO:
Step 1: Weekly Risk Reviews
Every week, before 1:1s with managers, CSMs review existing risks and log updates for all open CTAs. Updates should summarize:
- Current situation and “temperature” (e.g., healthy, neutral, at risk).
- Actions taken or planned to address the issue.
- Support needed from leadership.
Why it matters: A weekly cadence keeps risks visible, not forgotten. Even smaller teams can implement this with shared dashboards or simple CRM fields to track customer health.

Figure 1: CSMs provide a summary of their risk by creating a Risk CTA in Cockpit
CSMs can create a new Risk CTA via Cockpit and include a summary of the Risk CTA details for other team members to reference.

Figure 2: CSMs can easily keep track of their customer portfolio, including activities related to at-risk customers, via Gainsight Home.
CSMs do this weekly for all risks and provide three pieces of information in these weekly updates:
- Summary of the current situation, including “temperature” and “direction” (i.e., is the client “warm” / doing well or “cold” / unresponsive or worse)?
- How s/he is “pulling out all the stops” to address the risk
- Specific help needed from his/her Manager, if any.
Step 2: Pre-Meeting Flagging
Before 1:1s, CSMs flag any accounts needing managerial input or cross-functional help.
Why it matters: Advanced flagging gives managers time to review data and prep resources, ensuring coaching sessions are solutions-oriented, not reactive.
Step 3: Risk Discussion and Escalation Planning
During 1:1s, managers and CSMs co-review all flagged risks and decide which require executive awareness.
- If a resolution path exists, document and monitor it.
- If not, prepare for executive escalation.
Why it matters: Structured reviews help teams separate noise from true revenue risk.
Step 4: Manager Escalation and Context
If escalation is needed, managers provide their own summary alongside the CSM’s notes—ensuring the executive sees both perspectives and next steps.
Why it matters: Clear context saves time and avoids duplicate outreach or conflicting narratives with customers.
Step 5: Executive Review and Feedback
Executives (CCO, CRO, or CEO) review all escalated risks weekly. They log feedback and assign follow-up tasks with deadlines.
Why it matters: Regular executive visibility drives accountability and signals to customers that their partnership is being actively managed at the highest level.

Figure 3: Escalated risk can trigger playbooks that loop in executive involvement.
Team members can escalate risks that launch playbooks, including Executive intervention, using a simple dropdown within the CTA detail section
Step 6: Predict and Prevent Future Risks
Modern CS teams now combine structured processes with predictive analytics. Automated health scoring systems can detect churn signals—such as usage drops, unresolved support tickets, or key contact turnover—before they become formal risks.
Why it matters: Blending human review with machine insight helps CSMs prioritize attention where it matters most, preserving the “high-touch” experience while improving scale and speed.
Chapter 3
How to Win Executive Alignment & Listen at Scale
In high-touch customer success, lasting growth depends on executive alignment and systematic listening. This chapter explores how to build strategic relationships with senior sponsors while using Voice of the Customer (VoC) programs to capture feedback, surface insights, and drive continuous improvement.
Building and Sustaining Executive Relationships
Our CSMs might be working day-to-day with a director-level person, and that work is critical. But it’s equally important to ensure that we’re in close touch with the executive, who sets the objectives for the engagement and makes the decision on the renewal. Our leadership provides air cover for his/her team members by aligning with executives at our clients.
How to set up an Exec Check-in:
- Get a pulse-check on an individual customer from the Exec’s perspective
- Learn about any top-of-mind initiatives they are working on
- Share any insights or best practices that might be helpful in the current moment
The last one could mean anything from sharing thoughts on how to structure a team or process to get the most out of the product, to sharing learnings from customers who have faced similar challenges.
We suggest that your VP of CS (or other member of leadership, depending on the customer relationship) reach out to an Exec-level individual at each of your customers on a quarterly or twice quarterly basis. Your senior leaders are busy people, so you can set up these reminders via a CTA.
For example, every month, our VP of CS receives a CTA for a specific customer reminding him to reach out to the Exec contact at that customer (we call this an “Exec Check-In CTA”). This CTA has an associated Task with an Email Assist that our VP edits as needed and then sends out to the customer.
Once the Exec Check-in is completed, our VP posts his notes to Timeline via the CTA and drops a Milestone to track the last check-in.

Figure 4: Write with AI creates efficiency for timely and accurate customer communications and risk intervention.
Creating an Effective VoC Program
A strong Voice of Customer (VoC) program is a critical component to providing high-touch Customer Success. A VoC program means closing the loop and following up with an action, so responses translate to improvements in the product and customer experience.
We have an easy 3-step framework for VoC:
- Listen: Capture insightful feedback by giving your customers frequent opportunities to submit feedback.
- Act: Follow up promptly so customers know that they are heard. Quicker response to customer feedback results in a greater impact.
- Analyze: Assess progress against goals and measure improvement to keep the program on track.
Step 1: Listen
High-touch customer success relies on understanding every stakeholder—not just the day-to-day users. At most enterprise accounts, feedback should be gathered from five key personas: End Users, Admins, Adoption Champions, Executive Sponsors, and Senior Decision-Makers. Each group defines “value” differently, so mapping these roles early (ideally during onboarding or pre-sales) ensures that feedback is both complete and contextual.
To capture meaningful insights, establish a regular listening cadence across the relationship. Send relationship surveys (like NPS or CSAT) to all personas every six months, and analyze results by role to identify misalignment—for example, high user satisfaction but low executive confidence. Complement these with transactional surveys triggered after key milestones such as onboarding, implementation, renewals, or support interactions.
This multi-layered feedback approach helps identify which parts of the experience are thriving and where strategic intervention is needed—turning customer sentiment into actionable improvement.
To scale this process effectively, leading organizations are incorporating digital feedback channels and AI analysis to complement human outreach.
According to TSIA, best-in-class enterprise CS programs integrate automated sentiment analysis, in-product NPS triggers, and conversational AI surveys that summarize feedback in real time. These tools help CSMs detect sentiment shifts earlier, prioritize outreach, and spend more time on strategic engagement.
The result: digital augmentation accelerates human impact—helping teams reach more stakeholders, surface risks faster, and amplify the customer voice at scale.
Step 2: Act
It is important to close the loop and follow up on customer feedback immediately—be it positive or critical. We recommend implementing follow-ups in an “if this, then that” manner. For example, upon receiving a particularly low NPS score from a given customer, we recommend triggering a CTA with an associated Email Assist response in order to reach out for a conversation.
Conversely, if an NPS score (or set of scores) is extremely high for a customer, your CSM might consider reaching out to ask whether the customer would be willing to serve as a Sales reference or participate in a testimonial for your Customer Marketing efforts.
Step 3: Analyze
Once you have a strong listening program up and running, you will very quickly be collecting a large amount of valuable data. One of the most important uses of this data is benchmarking—that is, seeing how customers (or personas) stack up against each other or over time.
The quickest way to visualize the results of a given customer’s NPS survey (both at a current point in time as well as the trend) is to access the Surveys section of the C360. We have this section configured to show our CSMs’ average NPS by role over time:

Figure 5: NPS Chart
In order to dive deeper into individual responses, the Surveys section has a tab specifically dedicated to NPS. Within this section, our CSMs can view each respondent’s individual NPS score (plus comments).
Finally, to view responses to the one-off transactional feedback surveys described above, our CSMs navigate to the “Survey Responses” tab next to the “NPS Responses” tab within Surveys. Here, they can find and access the responses to all other surveys sent out through the platform.

Figure 6: Impact Analyzer helps better understand the factors that help drive NPS and CSAT.
Chapter 4
How To Tame Complex Accounts
Within some of our clients, there are often multiple BUs, geographies, or functions that may have different stakeholders, business goals, or even be in completely different lifecycle stages (i.e., stages of product deployment/adoption).
From an account perspective, they could even have completely different contracts. In a sense, this client is actually multiple clients internally (with sometimes very different high-touch workflows), and you may even consider staffing separate CSMs to each of them.
We need a tool to keep track of and manage each of these different “relationships” separately, which is exactly what Gainsight’s Relationships feature does.
Did You Know: According to Adobe’s 2025 AI & Digital Trends report, tech leaders double down on real-time behavioral insights and AI to tailor experiences, even in high-touch models. This gives strategic CSMs a sharper signal on when and where to intervene.
Imagine one of your clients has two completely separate business units with a different set of stakeholders and desired outcomes. Here are some of the most important metrics and features you will want to consider tracking and managing separately for each BU, which can be done with Relationships:
- Success Plans: Each BU will have its own unique objectives and success criteria
- Timeline: To avoid mixing up which meetings/calls were held with which BU, you will want to have separate Timeline views
- Product Usage: Just because overall usage for the client as a whole may be strong, one of the BUs may be struggling; it’s important to be able to see product usage separately to coach these clients back to health
- Scorecards: Certain scorecard measures may matter more for one BU than for another; Relationships allows you to see scorecard measures for that specific BU only, as well as customize what you see for a given BU so you can block out the noise
Tactically, once Relationships is configured, CSMs can navigate to the “Relationships” section of the C360 to view the various Relationships within an account (shown below as “cards”). We recommend placing the following overview information in these cards:
- Key contact/exec sponsor
- Lifecycle Stage
- ARR
- CSM
- NPS

Figure 7: Relationship Overview
Finally, it is possible to import contacts directly from SFDC to populate the contacts within each of your Relationships, which makes it easy and seamless to set up and navigate.
Streamline Strategic Account Management
See how Gainsight’s Customer Success platform helps enterprise teams manage risks, strengthen executive alignment, and operationalize lifecycle excellence—all in one place.
Chapter 5
How to Operationalize the Lifecycle
The lifecycle for your high-touch customer segment captures the heart of your methodology. What is your process for getting customers to value?
When we created our lifecycle for our Strategic clients, we spent a full day mapping out the phases and putting post-it notes for “critical moments” on the wall.
We divided our client lifecycle into four distinct “Phases” with one or more “Stages” in each:
- Phase 1: Pre-Sales
- Stage(s): Sell
- Phase 2: Onboarding
- Stage(s): Welcome, Deploy
- Phase 3: Adoption
- Stages(s): Adopt
- Phase 4: Growth
- Stage(s): Renew/Expand, Deploy II
We then laid out a detailed internal playbook for each stage in the Lifecycle: exactly what activities (internal and external) would occur at each stage, what we’d like the customer experience to look like, as well as the results we expect to be achieved upon the stage completion.

Figure 8: Detailed description of Lifecycle Stages
In addition to creating this detailed playbook, we also separately created a mapping of key customer touchpoints for each stage. This includes everything from the formal kick-off, initial exec alignment meeting, and onsite configuration, all the way to product feedback sessions with the customer once they are fully adopting.

Figure 9: Customer Touchpoints Across the Lifecycle
Finally, we created a third mapping that defines what each of our teams internally (Sales, CSMs, Onboarding, Tech Success) is responsible for at each stage. This has been critical to both clearly defining ownership as well as coordinating cross-functionally to deliver success throughout the customer’s lifecycle.

Figure 10: Internal Team Responsibilities by Lifecycle Stage
The aforementioned stages are what work for us, but you should come up with your own based on your product and specific customer needs. Once you’ve done so, it is critical (and relatively straightforward) to create CTAs for different activities.
Here are some of the ones we use:
- Pre-sales process CTA
- Sales handoff CTA
- EBR CTA
From here, you can build out additional processes to further manage critical lifecycle events. For example, for the EBR process, we suggest building out a dashboard for tracking EBR completion, recording notes related to the EBR within Timeline, and using Email Assists to follow up before and after the EBR.

Figure 11: EBR Completion Dashboard
Finally, once one of our aforementioned CTAs closes, our CSMs create a Milestone to mark the completion of this key event. We like using Milestones for recording completion (rather than, for example, Timeline) because these are key “lifecycle” events that typically occur once or in a predetermined cadence with a customer (e.g., the handoff from Sales to Post-Sales, an EBR, etc).
Chapter 6
How to Capture Institutional Memory
In a high-touch Customer Success world, CSMs build deep, long-lasting relationships as well as collect an enormous amount of “institutional” knowledge about their customers. This could include anything from an individual stakeholder’s sentiment about your product to challenges they are having internally with change management.
The CSM is a treasure trove of the most critical pieces of customer information, which poses a huge risk to your organization, given that this individual could transition out of the company or into another role at a moment’s notice.
It’s therefore hugely helpful that our CSMs record all their notes from customer interactions in Timeline, which we view as the ultimate note-taking tool. Within Timeline, CSMs log key “Activities” (such as a customer meeting, an update, an email, or a call) and can write detailed notes about these interactions.
Here are some examples of situations for which a CSM should use Timeline:
- Provide an update after a customer’s EBR
- Record a critical email exchange with a customer
- Document a phone call with the customer about their strategy
Every logged Activity is preserved chronologically in the system and is easily accessible to others at Gainsight who need to be informed.
Furthermore, Timeline allows the CSM to reference specific contacts in his/her notes: because Timeline is connected to our Salesforce Contacts, our CSMs can quickly find individuals and easily update things like Contact Title, Role, and Contact Information.

Figure 12:
We encourage our CSMs to have very strong hygiene around recording customer interactions and general customer knowledge. We recommend logging Timeline updates on a regular cadence, and many of our customers do the same. Certain activities, such as call recordings, emails, and meeting summaries, can be automatically logged to Timeline, which boosts efficiency and maintains a robust record of customer interactions.
We also trigger a CTA when a CSM hasn’t logged an update in Timeline in a while (i.e., after one week). With all of this information neatly, chronologically, and consistently documented in one centralized location, we have peace of mind that our customers will be in good hands should we need to transition them to another CSM.
Chapter 7
How to Plan for Successful Outcomes
Your Sales team has Account Plans to lay out how they will expand and upsell an account. The equivalent for your CSMs is a Success Plan. A Success Plan is the CSM’s internal account plan or roadmap for how s/he plans to achieve specific objectives for a client. A Success Plan could be defined together with the client, but we also use Success Plans internally to align on a strategy to grow the account.
We recommend starting with the following four types of Success Plans for your customers and then thinking through other use cases:
1. Customer Objectives Plan (Collaborative)
- In a Customer Objectives Plan, CSMs work closely with each of their clients to 1) define and lay out the objectives they are working on for the next quarter (or year), as well as 2) define measurable key success criteria for each of these objectives.
- It is critical to define these objectives/success criteria early in the customer’s lifecycle (i.e., capture these goals in the Success Plan as a part of pre-sales conversations with customers); the plan can then be passed on from pre-sales into onboarding and finally to the CSM.

Figure 13: Customer Success Plan
2. Get Well Plan (Internal)
- A Get Well Plan is an internal plan used to address those customers who have a red Overall Health Score—i.e., those customers that need to be nurtured back to health. We recommend listing out no more than 4 key objectives that need to happen in order to meaningfully improve the Overall Health Score.
- These objectives could be CSM tasks or they could be cross-functional—i.e., it could be Product needs to fix a bug, or there is an open Support risk that needs to be addressed. Each team can then take ownership of these tasks.
- We recommend CSMs make a draft of the plan, review it with their manager, get buy-in, and then use the plan to manage with the client.

Figure 14: Customer Goal tracking helps ensure key objectives are supported and met.
3. Adoption Plan (Internal)
An Adoption Plan is another internal plan geared at helping CSMs record and commit to targets around driving both depth of product adoption (DAU growth) as well as breadth of product adoption (feature adoption).
At the beginning of the quarter, CSMs should list individual objectives for each of these adoption metrics (i.e., increase DAUs by 20% or get clients using X, Y, Z features by the end of the quarter).
4. Account Plan
An Account Plan is an Internal collaborative plan between CSMs and Sales Reps to think through the steps needed to generate expansion/upsell within an account, as well as increase advocacy.
Chapter 8
How to Automate the Busywork
CSMs are high-leverage, strategic thinkers who want to be meeting with and helping their customers, not spending hours writing emails. But unlike in a tech touch / low touch Customer Success model, form emails (even tokenized ones) don’t work for high touch customers: these customers require a slightly more tailored message, or oftentimes the CSM wants to add a personal touch.
The Gift of Email Assist
At the same time, CSMs need not formulate emails completely from scratch. Our CSMs use Email Assist to leverage tokenized email templates for common use cases (see below) that can then be edited and personalized. In addition to saving your CSM’s precious time, customer communications are more consistent because a standardized template is always used as a base.
Email Assists can be used in a variety of different ways; here are some of our favorites:
- Reaching out to schedule an EBR
- Responding to a specific score from an NPS survey
- Reaching out about an upcoming renewal
- Invitations to Events (e.g., configuration sessions at Pulse)
- Usage drops
- Product releases
As a general rule, think of using Email Assist for any “if this, then that” scenario, particularly because CSMs can directly send Email Assists from Playbook tasks within a CTA.
For example, if a customer responds to an NPS survey with a low rating, a CTA can trigger with an associated Email Assist that allows the CSM to respond with a tailored message. Similarly, if a customer’s renewal is coming up within the next 90 days, an Email Assist can be sent with auto-populated customer data points (e.g., the customer’s renewal date).
Chapter 9
How to Make Expansion Inevitable
Our CSMs are always searching for ways to drive upsell and expansion into new BUs or other functions (i.e., Sales) within our largest customers.
The keys to not missing an expansion opportunity within an existing customer are 1) ensuring that CSMs and AEs/CAMs are communicating regularly and working collaboratively, and 2) providing them with clear indicators that a customer is ripe for expansion, including suggestions for specific opportunities.
For (1):
- We recommend creating a jointly owned Account Plan that CSMs and Sales Reps create together (we discussed this already in tip #6).
- This is a great first step in making sure your CSMs and Sales Reps are always on the same page, are aligned on expansion goals, and are reaching out to the right role at the right time within the customer.
For (2):
- We have a few different ways of “flagging” that a customer could be a good candidate for an expansion opportunity.
Some of these include:
Deployment Scorecard
One of the most useful scorecards we have to alert our CSMs of whether there is an opportunity for upsell (or conversely a product usage risk) is our Deployment Score. We obviously consider a high deployment number a strong indicator that a customer needs more licenses, or potentially even licenses for customers in new functions (i.e., Sales or Marketing).
Our CSMs regularly take a look at a list of their customers and Deployment scores, which we have also mapped to “Green” through “Red” indicators.
- For customers in “Green,” our CSMs will proactively reach out regarding expansion.
- For those in “Red” or “Orange,” the CSM will launch other efforts in order to deploy undeployed licenses in a systematic way.

Figure 15: Creating Customer Success Qualified Leads (CSQLs) ensures that expansion or upsell opportunities are easily tracked and seamlessly passed from Customer Success to Sales.
Product Whitespace Dashboard
One of the most critical pieces of information for a CSM or Rep to know when trying to upsell a customer is understanding what they have already bought from you. The difference between what they already have and the full set of SKUs they could buy is what we call the product whitespace.
This is essentially a list of all of the potential products a customer could buy from you but hasn’t yet taken advantage of. Armed with this information, a CSM can start having strategic conversations with a customer long before renewal time in order to guide them in the direction of purchasing new SKUs.
We recommend porting this information into a dashboard within Gainsight, so it is always at hand to the CSM and Rep.
Feature Usage
For our own customers, we track usage of our “stickiest” features—those that we know are highly correlated with strong adoption and retention. We do this by creating scorecards for individual features (with metrics like “monthly pageviews / full users”) based on usage data.
We can then track, every week, how strongly a given customer is using a feature and how they are trending towards better feature adoption. A customer who is in “Green” (strong usage) across five or more of the seven features we track is considered a strong, healthy user of our product.
Our CSMs live in this feature data as it allows them visibility into where customers are struggling with the product and gives them the tools to have very structured, focused customer conversations about best practices and ways to drive better adoption.
Conversely, for customers who are healthy users, our CSMs can confidently hold conversations about upsell or cross-sell opportunities, knowing that the customer is already seeing significant value from the product.
Similar to the Deployment CTA, we recommend creating a CTA that triggers when a customer moves into “healthy” usage and following up with that customer about expansion.

Figure 16: Adoption Explorer
Chapter 10
How to Orchestrate Cross-Functional Ownership
High-touch customer success doesn’t operate in isolation—it’s a team sport. Seamless collaboration between Product, Support, and Customer Success ensures every customer transition, escalation, and feedback loop drives continuous value and strengthens long-term relationships.
Define Cross-Functional Processes & the Initial Value Moment
The official handover from your onboarding team to your CS team is a critical moment that you don’t want to get wrong. Services must make sure the customer is set up and seeing sufficient value out of the product before getting CS involved for the long haul.
We call this the “Initial Value Moment” or IVM—and we have a standardized set of criteria a customer has to meet before Services can ask the CSM team to engage.
During the Onboarding of customers, we first roll out to a pilot group of ~10% of the total licenses we intend to deploy. For example, if we are selling to a team of 200 users, we will define a pilot group of 20 to onboard first before starting the process with the others. For the CSM team to get involved, the pilot group must hit the IVM, which is defined as:
- Overall healthy product usage: Two weeks of Green usage in our Habits scorecard, which is a proxy for active product usage.
- Breadth of product usage: Two weeks of strong product feature usage of at least 5 features—we have a scorecard for this, too
- Tactical graduation criteria: e.g., detailed documentation of the instance completed, a confident Admin up and running, etc.
Once IVM has been hit with the pilot group, our CSM gets involved. It doesn’t mean the Services engagement is over—there are still more customers to Onboard!—it just means that we can now begin the process of handing over the relationship to CS.
We recommend following a similar cross-functional process to ensure there are never any dropped balls in handover!
Collaborate With Product to Treat Clients as Partners
The most valuable product feedback comes directly from your customers. But instead of having your CSMs serve as a go-between for this feedback, we recommend actively facilitating direct two-way conversations between your company’s Product team and the customer.
Here are some ways we suggest creating these points of contact for your high-touch customers:
- Customer Advisory Board (quarterly): Organize a customer invite-only webinar where the Product team shares the upcoming product roadmap, asks directly for feedback on in-progress features, as well future areas of focus
- Personalized release announcements (at release): Send an email to announce an upcoming product release. Email Assist can be used to add a personal touch and call out specific features that will be impactful to an individual customer
- Product Risk CTAs (ongoing): Create Product Risk CTAs to capture specific product pain points or other feedback a customer may have; internally, CSMs can assign this CTA to someone from the Product team who can post progress updates, as well as be looped into any customer conversations if the issue is more serious
Partner With Support to Anticipate and Manage Risk
Your support team is far from a siloed function. Given that Support risks can often be early signs of customer frustration, it is critical to implement a robust support risk process to get ahead of the situation and work closely with the key stakeholders internally and at the customer.
Our Support Risk process specifically addresses two types of risks: Support Risks and Bug Risks. We also collaborate cross-functionally with the onboarding and CSM teams on Product Risks.
Our Support team utilizes a combination of Calls to Action and Scorecards to address risks. A Support Risk CTA will trigger for a given customer in one of three situations:
- High volume of support tickets
- A ticket has been open for a long period of time
- The priority level is High or Urgent, and the ticket hasn’t been resolved within a specified period of time
The thresholds set to trigger the CTA will be unique for the customer and could also be unique by business unit within the customer. When setting up our thresholds, the Support team considered goals around time to resolution as well as the quality of customer experience we wanted to commit to.
When it comes to bugs, we have rolled out a very similar process, which focuses on tickets that have been classified as product bugs. A Bug Risk CTA triggers when there is one of three situations:
- High volume of bug tickets—the threshold set is dependent on the size of the customer base
- High-priority bug ticket has been open for over 30 days
When risks are triggered (either for Support or for Bugs), they are assigned to our respective support managers with a task in the playbook assigned to the CSM to keep them informed.
Finally, we created a Scorecard component for support and bug risk categories and linked those Scorecards to Risk CTAs. The existence of a particular Risk CTA influences the color of the corresponding scorecard.
For more on our cross-functional Support Risk process, check out this post on Why Your Support Team Should Be Using Gainsight.
Ensure Smooth Handoffs Between Teams
A successful handoff between Services, CS, and other functions ensures continuity and confidence for the customer. Each team should document progress, share context (such as goals, milestones, and risks), and align on ownership before transition.
A standardized checklist or handoff template—covering implementation status, adoption readiness, and next steps—prevents gaps or duplicated effort. Consistent internal communication keeps the customer experience seamless, even as ownership shifts from one stage to the next.
Deliver Scalable, Human-First Customer Success
Ready to unify data, automate playbooks, and help your CSMs focus on what matters most? Schedule a personalized demo to see Gainsight in action.
Turn Every Enterprise Relationship Into a Growth Engine
High-touch customer success is where strategy meets execution—a balance of human connection and operational rigor. By standardizing your processes, leveraging automation, and staying close to your customers’ evolving needs, you can transform every strategic account into a source of durable growth.
With Gainsight’s Customer Success platform, your teams can unify data, automate playbooks, and surface real-time insights that help high-touch CSMs act faster and smarter. From risk escalation to executive engagement, Gainsight gives you the visibility and precision to deliver scalable, personal, and outcome-driven experiences.
Build stronger partnerships. Drive predictable renewals. Unlock expansion at scale. Schedule a demo to see how Gainsight helps you elevate high-touch customer success into a repeatable engine for growth.